The Challenge
Traceability of the material was the biggest challenge for the client – leading to several inefficiencies. With the formwork components undergoing a series of changes in the yard to make them suitable for construction, the BOQ of the inward material has a distinct variation to that of outward, making reconciliation difficult. Many a time non-standard formwork components had to be newly fabricated as the existence of the same type with the same dimensions in the yard was not known. Lack of an intelligent system to record receipt, refurbishment and dispatch of aluminium formwork components at the yard (which was being managed with the help of spreadsheets and manual record-keeping) was widely felt.